Rusty impeller show as the photo above .
Related items
IMPELLER AFTER FINAL LAYER COATING
Job completed of impeller by applying second layer of Chesterton ARC S2 (Green) Coating.
APPLY FIRST COAT OF ARC 855 (BLACK)
Dew point meter checked after the impeller apply first coat of Chesterton ARC 855 (BLACK).
IMPELLER AFTER BLASTING
Profile checked and chloride test approve after blasting.