After a seal part polished, it place under a monochromatic light and an optical flat is position over its surface. Monochromatic light sources normally use for inspection of mechanical seals in manufa
HYDROTESTING FOR LEAKAGE
Hydrotesting known as leak testing and pressure testing, it helps to evaluate the integrity of vessels that are use under the pressure. The purpose of this test is to locate leaks, confirm the strengt
LAPPING SERVICE
Friction faces in mechanical seals are usually is the most damaged parts after a long time or certain time of use. Lapping service is a process where can help to remove the damage layers and restore t
FINAL LAYER OF COATING APPLIED ON TEST SEPARATOR HEATER
Final coating applied by our production team before do the final check of coating thickness.
FINAL LAYER OF COATING APPLIED ON TEST SEPARATOR HEATER
Final coating applied and our production team do the final check of coating thickness.
FIRST LAYER OF COATING APPLIED ON TEST SEPARATOR HEATER
DFT checked after first layer of coating applied on test separator heater .
THERMAL SPRAY ALUMINIUM
Thermal spray aluminum coating apply on test separator for the protection from aqueous corrosion, including offshore structures and components that are exposed to seawater immersion, tidal and splash zone environments.
TEST SEPARATOR HEATER AFTER BLASTING
Photo above is about the test separator heater after blasting.
TEST SEPARATOR HEATER BEFORE BLASTING
Photo above show the test separator heater’s condition before blasting.
IMPELLER AFTER FINAL LAYER COATING
Job completed of impeller by applying second layer of Chesterton ARC S2 (Green) Coating.
APPLY FIRST COAT OF ARC 855 (BLACK)
Dew point meter checked after the impeller apply first coat of Chesterton ARC 855 (BLACK).