Block valve fugitive emissions are effectively reduced to below consent decree requirements with this high performance valve stem packing.
BELL MOUTH AFTER TWO LAYERS COATING
Job completed of bell mouth by applying 2 layer of Chesterton Arc SD4i on it .
BELL MOUTH AFTER REBUILD SURFACE
Bell mouth has been rebuild surface by applying ARC 858.
JOB COMPLETION OF PUMP CASING
Pump casing is fully completed by applying ARC S1PW and done with the final coating thickness checking .
PUMP CASING AFTER APPLY ARC COATING
Pump casing has been rebuild surface by applying ARC 858 .
PUMP CASING AFTER BLASTING
Pump casing was first grit to clean the surface and do the blasting. In addition , we will do the profile check such as profile check and dew point meter for environmental monitoring .
PUMP CASING BEFORE BLASTING
Photo as above show that the surface of pump casing is full with rust grade and substrate condition .
EYELET MACHINE
Eyelet machine reinforce the hole and prevents it from stretching or to shield something from the sharp edges of the hole. Usually, we will offer customer different sizes and designs according to cust
MITUTOYO CALLIPER
The Mitutoyo ABSOLUTE digital caliper delivers accurate, repeatable outside dimension, inside dimension, depth and step measurements with accuracy and unrestricted speed.
SPIRAL WOUND GASKET COMPRESSION TESTING MACHINE
Testing is required to ensure the nominal torque applied to the joint results in an effective seal. The compression tests spiral wound gaskets to meet the minimum requirements listed in the ASME B16.20 standards, for both standard and low stress gaskets
RTJ HARDNESS TESTER MACHINE
To ensure and check the hardness of RTJ that meet the requirement as per API-Specification 6A and a minimum of 30 BHN softer than the flange, the rings will deform and affect a seal without damaging the RTJ grooves on the flanges.
























