Final coating applied by our production team before do the final check of coating thickness.
FINAL LAYER OF COATING APPLIED ON TEST SEPARATOR HEATER
Final coating applied and our production team do the final check of coating thickness.
FIRST LAYER OF COATING APPLIED ON TEST SEPARATOR HEATER
DFT checked after first layer of coating applied on test separator heater .
THERMAL SPRAY ALUMINIUM
Thermal spray aluminum coating apply on test separator for the protection from aqueous corrosion, including offshore structures and components that are exposed to seawater immersion, tidal and splash zone environments.
TEST SEPARATOR HEATER AFTER BLASTING
Photo above is about the test separator heater after blasting.
TEST SEPARATOR HEATER BEFORE BLASTING
Photo above show the test separator heater’s condition before blasting.
IMPELLER AFTER FINAL LAYER COATING
Job completed of impeller by applying second layer of Chesterton ARC S2 (Green) Coating.
APPLY FIRST COAT OF ARC 855 (BLACK)
Dew point meter checked after the impeller apply first coat of Chesterton ARC 855 (BLACK).
BELL MOUTH AFTER TWO LAYERS COATING
Job completed of bell mouth by applying 2 layer of Chesterton Arc SD4i on it .
BELL MOUTH AFTER REBUILD SURFACE
Bell mouth has been rebuild surface by applying ARC 858.
JOB COMPLETION OF PUMP CASING
Pump casing is fully completed by applying ARC S1PW and done with the final coating thickness checking .
PUMP CASING AFTER APPLY ARC COATING
Pump casing has been rebuild surface by applying ARC 858 .
PUMP CASING AFTER BLASTING
Pump casing was first grit to clean the surface and do the blasting. In addition , we will do the profile check such as profile check and dew point meter for environmental monitoring .
PUMP CASING BEFORE BLASTING
Photo as above show that the surface of pump casing is full with rust grade and substrate condition .
BELL MOUTH BEFORE BLASTING
Bell mouth with uneven surface was receive from customer site.